Commissioned October 2010
———
Aberdeenshire
Installed to provide power to a sawmill on site with excess sold to the National Grid.
Specifications
———
Client: Private
Type: Fully Enclosed
Maximum power output: 14.5 kW
Annual CO2 saved: 20 tonnes