Linton Lock

Linton Lock

Linton Lock

Commissioned July 2012

———

North Yorkshire

Investment site – all power sold to the National Grid.

 

Specifications

———

Client: Private
Type: Full compact
Maximum power output: 100 kW
Annual CO2 saved: 298 tonnes