Bonfield Ghyll

Bonfield Ghyll

Bonfield Ghyll

Commissioned September 2006

———

North Yorkshire

Installed to replace a diesel-generator providing power to an off-grid farmhouse.

 

Specifications

———

Client: National Trust
Type: Full Enclosed
Maximum power output: 1.0 kW
Estimated annual output: 3,500 kWh
Annual CO2 saved: 1.5 tonnes