Bullhouse Mill

Bullhouse Mill

Bullhouse Mill

Commissioned December 2011

———

Sheffield

The Bullhouse Mill scheme was installed to provide power to a private dwelling, in particular providing power to a ground source heat pump.

 

Specifications

———

Client: Private
Type: Fully enclosed
Maximum power output: 10 kW
Annual CO2 saved: 20 tonnes